The CCNP course offered at KBM, trains students briefly for the 642-902 and 642-813 certification exams by CISCO.
You will learn routing and switching concepts in detail and will be able to handle enterprise level businesses equipped with Cisco routers and switches. This will cover routing protocols in depth, network performance issues, path control, inter-VLAN routing, security features in a switched network, accommodate voice and video in a network.
Successful completion of this CCNP level course will give you ample knowledge and understanding to apply your newly learnt skills directly in the work industry and thus start a successful career as a Network assistant, Network administrator or Jr. Network Engineer in the IT support industry.
CCNA Form :
Cost and duration
Course duration |
5 days |
Cost |
£ 899 |
Hours |
64 hours |
Schedule
Day1 |
EIGRP & OSPF |
Day2 |
IP Addressing & Router operation |
Day3 |
Wireless LAN fundamentals |
Day4 |
Redistribution using IPv4 and IPv6 |
Day5 |
Layer 3 Path Control and Vlan |
Day6 |
Security in Layer 2 |
Day7 |
Implementing Layer 3 services and advanced services implementation |
Day8 |
Troubleshooting |
Course Content
Implement an EIGRP based solution, given a network design and a set of requirements
- Determine network resources needed for implementing EIGRP in a network
- Create an EIGRP implementation plan
- Create an EIGRP verification plan
- Configure EIGRP routing
- Verify an EIGRP solution was implemented properly using show and debug commands
- Document the verification results for an EIGRP implementation
Implement a multi-area OSPF Network, given a network design and set of requirements
- Determine network resources needed for implementing OSPF on a network
- Create an OSPF implementation plan
- Create an OSPF verification plan
- Configure OSPF routing
- Verify OSPF solution was implemented properly using show and debug commands
- Document the verification results for an OSPF implementation plan
Implement an IPv6 based solution, given a network design and a set of requirements
- Determine network resources needed for implementing IPv6 on a network
- Create an IPv6 implementation plan
- Create an IPv6 verification plan
- Configure IPv6 routing
- Configure IPv6 interoperation with IPv4
- Verify IPv6 solution was implemented properly using show and debug commands
- Document verification results for an IPv6 implementation plan
Implement an IPv4 or IPv6 based redistribution solution, given a network design and set of requirements
- Create a redistribution implementation plan based upon the results from a redistribution analysis
- Create a redistribution verification plan
- Configure a redistribution solution
- Verify that a redistribution was implemented
- Document results of a redistribution implementation and verification plan
- Identify the differences between implementing an IPv4 and IPv6 redistribution solution
Implement Layer 3 Path Control Solution
- Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
- Create a Layer 3 path control verification plan
- Configure Layer 3 path control
- Verify that a Layer 3 path control was implemented
- Document results of a Layer 3 path control implementation and verification plan
Implement VLAN based solution, given a network design and a set of requirements
- Determine network resources needed for implementing a VLAN based solution on a network
- Create a VLAN based implementation plan
- Create a VLAN based verification plan
- Configure switch-to-switch connectivity for the VLAN based solution
- Configure loop prevention for the VLAN based solution
- Configure Access Ports for the VLAN based solution
- Verify the VLAN based solution was implemented properly using show and debug commands
- Document the verification after implementing a VLAN solution
Implement a Security Extension of a Layer 2 solution, given a network design and set of requirements
Operating Systems
- Determine network resources needed for implementing a Security solution
- Create a implementation plan for the Security solution
- Create a verification plan for the Security solution
- Configure port security features
- Configure general switch security features
- Configure private VLANs
- Configure VACL and PACL
- Verify the Security based solution was implemented properly using show and debug commands
- Document the verification results after implementing a Security solution
Implement Switch based Layer 3 services, given a network design and a set of requirements
Security
- Determine network resources needed for implementing a Switch based Layer 3 solution
- Create an implementation plan for the Switch based Layer 3 solution
- Create a verification plan for the Switch based Layer 3 solution
- Configure routing interfaces
- Configure Layer 3 Security
- Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
Prepare infrastructure to support advanced services
Mobile Devices
- Implement a Wireless Extension of a Layer 2 solution
- Implement a VoIP support solution
- Implement video support solution